O. P. Jindal University, Raigarh (C.G.) OPJU CONTACT US Gallery
cqtf@opju.ac.in
OPJU  /  Centers  /  Central Quality Testing Facility
ISO/IEC 17025:2017 Quality Framework

Central Quality
Testing Facility

Reliable, technically sound testing services supporting academia, industry, government bodies and organizations through competent personnel, suitable facilities and controlled quality processes.

0
Testing-scope entries supplied for CQTF
0
Well-equipped laboratories across OPJU
0
Networked computer systems at OPJU
0
Faculty with PhD — current OPJU homepage figure
About CQTF

Testing built around competence, impartiality and reliability.

OPJU has established CQTF to strengthen research, consultancy and quality-assurance activities. The supplied CQTF content describes a structured quality framework supporting material evaluation and technical analysis in accordance with applicable standards.

01 / TECHNICAL COMPETENCE

Competent personnel & suitable facilities

Testing is managed under a structured quality framework with competent personnel and suitable facilities, supporting technically valid laboratory operations.

02 / CONTROLLED OPERATIONS

Documented and controlled processes

Maintenance, controlled conditions, standardized procedures, calibration and verification are positioned as core parts of the laboratory quality system.

03 / STAKEHOLDER CONFIDENCE

Reliable results for collaboration

Systematic quality management, confidentiality, impartiality and continual improvement support research and collaboration with external stakeholders.

04 / OPJU ECOSYSTEM

Connected to a research-focused university

OPJU publicly lists engineering, science, research, laboratory and Central Instrumentation Facility resources as part of its wider academic infrastructure.

Quality Framework

Committed to technically valid and timely testing.

The CQTF source content states a commitment to ISO/IEC 17025:2017, applicable NABL criteria, impartiality, confidentiality, professional integrity, competent personnel, suitable facilities, standardized methods and calibrated equipment.

Our quality commitment

Accuracy is designed into the process.

From equipment status and environmental conditions to competence evaluation, internal audits and corrective actions, the supplied objectives define measurable controls for continual improvement.

At least 95% on-time issuance of reports within committed turnaround time.
100% availability of calibrated/verified critical equipment and zero use of overdue equipment.
At least 95% compliance with specified environmental conditions required for testing.
100% annual competence evaluation of authorized laboratory personnel.
At least 90% satisfactory PT/ILC performance where applicable.
At least 90% customer satisfaction and closure of 100% complaints within 15 working days.
Zero substantiated breaches of impartiality and confidentiality.
100% scheduled internal audits and management reviews; ≥90% corrective actions closed within target date.
Our Team

Responsibilities & authorities

Role and responsibility content below is carried forward from the supplied CQTF page.

Testing Scope / Services

Search the CQTF testing scope.

Filter the 55 supplied entries by discipline, material or test parameter.

#DisciplineMaterial / ProductTest / ParameterTest Method / Specification
Laboratory Infrastructure

Inside the OPJU laboratory ecosystem.

The gallery uses official OPJU-hosted imagery and the OPJU infrastructure ecosystem as visual context. Replace/add CQTF-specific photographs when approved images are available.

View OPJU Gallery →
MechanicalSoil, rocks & building-material testing scope
CivilMaterial and geotechnical testing environment
MetallurgyHardness and metallic-material testing
CIF / ResearchOPJU's wider instrumentation ecosystem
Enquiry

Start your testing request.

Connect with CQTF for sample, testing and technical enquiry requirements.

CQTF TEST REQUEST

Bring your material. Get a structured testing pathway.

The supplied source indicates that the final test-request form URL is still pending. Keep the button below ready for the approved OPJU form URL.

Email CQTF → OPJU Contact Page
Connect with us

OPJU Central Quality Testing Facility

Email: cqtf@opju.ac.in

Technical Head – Civil: Dr. M. Nithya | +91 84388 81708

Technical Head – Metallurgy: Dr. M. Kalyan Phani | +91 94458 84028

Campus: OP Jindal University, Punjipathra, Raigarh, Chhattisgarh – 496109